Item Coversheet

ALAMEDA UNIFIED SCHOOL DISTRICT
BOARD AGENDA ITEM


Item Title:Approval of Measure I Contracts (Standing Item)
Item Type:Consent
Background:
 

Alameda voters approved Measure I in November 2014, and the Bond Program Project Schedule: Option 5A was approved at the April 14, 2015 board meeting.

As the bond program schedule dictates, there will be various contracts to come before the Board for approval.  Contracts may include construction bid contracts, architectural services contract addenda, specialists/consultants agreements, etc. Staff has created a standing board item to approve the bond program contracts to keep the bond program contracts separate from the approval of other contracts.

 

1. (Fund 21) Contracts for Repairs, Maintenance or Small Construction Projects between AUSD and Lathrop Construction Associates for a total of $34,655.00. (Encinal)

2. (Fund 21) Contracts for Repairs, Maintenance or Small Construction Projects between AUSD and MBS Engineering for a total of $92,845.00 (Various)

3. (Fund 21) Amendment No. 1 to Independent Contractor Agreement for Professional Architect Services between AUSD and Quattrocchi Kwok Architects for a fee increase of $17,900.00. (AOA/Chipman Playground)

4. (Fund 21) Project Addendum No. 211612.5 to Agreement for Architectural Services for Measure I Bond Projects between AUSD and Quattrocchi Kwok Architects for a fee increase of $10,400.00. (Love)

5. (Fund 21) Project Addendum No. 211602.4  to Agreement for Architectural Services for Measure I Bond Projects between AUSD and Quattrocchi Kwok Architects for a fee increase of $19,311.00. (Lincoln)

6. (Fund 21) Project Addendum No. 211601.4 to Agreement for Architectural Services for Measure I Bond Projects between AUSD and Quattrocchi Kwok Architects for a fee increase of $3,700.00. (Franklin)

7. (Fund 21) Change Order No. 005 to Lease-leaseback Contract between AUSD and Lathrop Construction Associates for an increase of $137,937.00. (Encinal Phase II)

8. (Fund 21) Change Order No. 004 to Lease-leaseback Contract between AUSD and Lathrop Construction Associates for an increase of $34,672.00. (Franklin)

9. (Fund 21) Amendment No.2 to Professional Services Agreement between AUSD Apodaca Mechanical & Consulting for an increase of a flat fee not to exceed $30,000.00. (Encinal)

10. (Fund 21) Professional Services Agreement between AUSD and Miller Pacific Engineering Group for a flat fee not to exceed $9,000.00. (AOA/Chipman Playground)

11. (Fund 21) Professional Services Agreement between AUSD and Orbach Huff Suarez + Henderson, LLP for an hourly rate of $275.00 with a total not to exceed $50,000.00. (Various)

 
 
 
 
 
 
 
 
 
AUSD LCAP Goals:4. Ensure that all students have access to basic services.
Fund Codes:21 Building – Bond Fund
Fiscal Analysis

Amount (Savings) (Cost):


See attached contract(s) for detailed expenditures.
Recommendation:Approve as submitted.
AUSD Guiding Principle:#5 - Accountability, transparency, and trust are necessary at all levels of the organization.| #6 - Allocation of funds must support our vision, mission, and guiding principles.
Submitted By:Shariq Khan, Chief Business Officer

ATTACHMENTS:
DescriptionUpload DateType
Lathrop Construction Associates, Inc. (Encinal Gym)12/8/2020Backup Material
MBS Engineering12/8/2020Backup Material
QKA Amendment 112/8/2020Backup Material
QKA 211612.512/8/2020Backup Material
QKA 211602.412/8/2020Backup Material
QKA 211601.412/8/2020Backup Material
Lathrop Construction Associates, Inc. COO 512/8/2020Backup Material
Lathrop Construction Associates, Inc. COO 412/8/2020Backup Material
Apodoca Mechanical Consulting12/8/2020Backup Material
Miller Pacific Engineering Group12/8/2020Backup Material
Orbach Huff Suarez Henderson12/8/2020Backup Material